Road Update
The Project Master’s Signature
PILLING WORK IS PROGRESS ON THE 13 SPAN BRIDGE AT SHUWA, MADAGALI LGA
Grade Inter-Change
Roads Update

Construction of First-ever Fly-Over in the Northeastern Nigeria at Total Junction, Yola (completed)

CONSTRUCTION OF FIRST-EVER GRADE INTERCHANGE AND UNDERPASS IN NORTHEASTERN NIGERIA AT POLICE ROUND-ABOUT, YOLA – THE STATE CAPITAL.

CONSTRUCTION OF 3.5KM TOWNSHIP ROAD IN NUMAN L.G (COMPLETED).

CONSTRUCTION OF 3.2KM TOWNSHIP ROAD IN HONG L.G (COMPLETED).

CONSTRUCTION OF 3.8KM JADA TOWNSHIP ROADS.

ONGOING CONSTRUCTION OF 6.6KM GULAK TOWNSHIP, MADAGALI L.G (COMPLETED).

CONSTRUCTION OF 7.8KM TOWNSHIP ROAD IN MICHIKA L.G (COMPLETED).

CONSTRUCTION OF ROADS AT BACHURE, KAREWA, NASARAWO BOREHOLE, SCOPE ROAD, JAMBUTU STREET, TOGO STREET, LEKKI TABA STREET, MAMBILA STREET & LINK – ALL IN JIMETA (ALL COMPLETED).

CONSTRUCTION OF 5 TOWNSHIP ROADS IN YOLA SOUTH – INCLUDING THAT OF NYIBANGO-YOLDE PATE (3.185KM WITH 2 SPAN BRIDGES) WHICH WILL ALSO SERVE AS THE FIRST BYE-PASS ROAD LINKING YOLA TO JIMETA (2 OF THE 5 ARE COMPLETED).
KIRI-SHELLENG ROAD UNDER CONSTRUCTION.

8.8KM SAMSRI RURAL ROAD (GANYE L.G)

YERIMA MAYO RURAL ACCESS ROAD (TOUNGO)

PARDA-MUNINGA ROAD (FUFORE L.G). UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ALL COMPLETED).

25KM BAZZA-ZAA ROAD (MICHIKA L.G)

16.9KM MARARRABA DUMNE-HOMBO RURAL ROAD (SONG L.G). UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ON GOING).

31KM NDIKONG RURAL ROAD (MAYO BELWA). UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ALL COMPLETED).

CONSTRUCTION OF ROAD AT DOCTORS QUARTERS YOLA-SOUTH LGA

HONG-KUVU GAYA (HONG L.G) AND CONSTRUCTION OF 3 CELL OF 3 BY 2 METERS BOX CULVERT ALONG MATAKAM-FUTU ROAD (MICHIKA L.G) – UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ALL COMPLETED).

Replacement of Transformers

CONSTRUCTION OF 20.8 Km SUPER HIGH WAY FROM WELCOME TO YOLA TO RUMDE

Reconnected Michika and Madagali to the National after 6 years

Supervision of installation of transformers

Provision of electric transformers to 45 local communities in Adamawa under the Ministry of Rural Infrastructure & Community Development

Connected Toungo LG to the National Grid for the first time in 25 years
Ongoing Construction of 2.42 Township Roads in Mubi South Local Government

Construction of drainage at the site

Dump trucks, pilling dirt around the site and slope the land to meet the needs of the road.

Excavation process to creating a pathway to direct water away from the road surface.

Construction of a 7.8-kilometer road at Vi/Bokka Ward in Michika Local Government Passing through Wambilimi, Yamwe to Vi communities.

Construction of drainage at the site

GOVERNOR AHMADU UMARU FINTIRI IS REMODELLING AND UPGRADING FOUR GOVERNMENT HOUSE LODGES
NG CARES ADAMAWA DLI 2.2 PROJECTS INFRATRUCTURE IMPLEMENTED IN ADAMAWA STATE

Road project at Dukdu Toungo LGA

Bode in Shelleng LGA

Wuro Kohi Mayo Farang

Bolki Road in Guyuk LGA

Wuro Hawu Gantan in Jada LGA

Kumare community in Hong LGA

Madzi Bidi Road

Gangoki Market road in Ganye

Ghumbuli road

Wuro Kohi Mayo farang in Mayo Belwa LGA

Yaza palala in Mubi-North

Walawa-juda road in Gombi

Rugange Bajeng road Lamurde LGA

Bachure Community in Yola-North LGA

Ongoing Construction of Mubi Round about Flyover

Ongoing construction of storm water drainage at Saminaka FGGC Yola

Ongoing road construction linking Wuro Ngayadi Bridge Kirchinga ward Madagali LGA

update on the ongoing construction of road network at 1000 Housing unit

Update of Work on Mampaya road in Uba

Construction of pedestrian flyovers in Jimeta

Update on the ongoing construction of Mubi-Roundabout Flyover

ADAMAWA ULTRA MODERN STADIUM PROJECT UPDATE

Makama B road

Bagale Road in Fufore LGA

32 millimeter-diameter rods to ensure structural integrity at the ongoing Mubi roundabout flyover

Ongoing construction of storm water drainage at Saminaka FGGC Yola

Roads construction at Wuro Ngayadi Kirchinga ward Madagali LGA

Ongoing construction of road network at 1000 Housing unit

Progress of Work on Mampaya road in Uba

Construction of Stormwater drainages in Gulak and Shuwa of Madagali

Update on the ongoing construction of Mubi-Round about flyover

Adamawa State Government constructed the New Governor’s Office in Yola, Adamawa State

Dong Gamadiyo ring culvert

Mayel-Salma Wuro Mallum road in Maiha LGA

Road construction to ease difficulties during rainy season at Saminaka FGGC Yola

Ongoing construction of Wurongayandi Bridge in Kirchinga Ward, Madagali

Wuro Ngayadi Bridge Kirchinga ward ongoing Madagali LGA

ONGOING CONSTRUCTION OF 2,000 HOUSING ESTATES FOR CIVIL SERVANTS AT MALKOHI, YOLA.

UPDATE ON THE ONGOING CONSTRUCTION OF 1,000 HOUSING ESTATES FOR AT MALKOHI, YOLA.

Construction of Madagali Township Roads

STAGE OF CONSTRUCTION WORKS ON THE MUBI ROUNDABOUT FLYOVER

MUBI ROUNABOUT FLYOVER