Road Update

The Project Master’s Signature

Grade Inter-Change

Roads Update

Construction of First-ever Fly-Over in the Northeastern Nigeria at Total Junction, Yola (completed)

 CONSTRUCTION OF FIRST-EVER GRADE INTERCHANGE AND UNDERPASS IN NORTHEASTERN NIGERIA AT POLICE ROUND-ABOUT, YOLA – THE STATE CAPITAL.

 CONSTRUCTION OF 3.5KM TOWNSHIP ROAD IN NUMAN L.G (COMPLETED).

 CONSTRUCTION OF 3.2KM TOWNSHIP ROAD IN HONG L.G (COMPLETED).

CONSTRUCTION OF 3.8KM JADA TOWNSHIP ROADS.

ONGOING CONSTRUCTION OF 6.6KM GULAK TOWNSHIP, MADAGALI L.G (COMPLETED).

CONSTRUCTION OF 7.8KM TOWNSHIP ROAD IN MICHIKA L.G (COMPLETED).

CONSTRUCTION OF ROADS AT BACHURE, KAREWA, NASARAWO BOREHOLE, SCOPE ROAD, JAMBUTU STREET, TOGO STREET, LEKKI TABA STREET, MAMBILA STREET & LINK – ALL IN JIMETA (ALL COMPLETED).

CONSTRUCTION OF 5 TOWNSHIP ROADS IN YOLA SOUTH – INCLUDING THAT OF NYIBANGO-YOLDE PATE (3.185KM WITH 2 SPAN BRIDGES) WHICH WILL ALSO SERVE AS THE FIRST BYE-PASS ROAD LINKING YOLA TO JIMETA (2 OF THE 5 ARE COMPLETED).

KIRI-SHELLENG ROAD UNDER CONSTRUCTION.

8.8KM SAMSRI RURAL ROAD (GANYE L.G)

YERIMA MAYO RURAL ACCESS ROAD (TOUNGO)

PARDA-MUNINGA ROAD (FUFORE L.G). UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ALL COMPLETED).

TEE_5188

25KM BAZZA-ZAA ROAD (MICHIKA L.G)

 16.9KM MARARRABA DUMNE-HOMBO RURAL ROAD (SONG L.G). UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ON GOING).

 31KM NDIKONG RURAL ROAD (MAYO BELWA). UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ALL COMPLETED).

CONSTRUCTION OF ROAD AT DOCTORS QUARTERS YOLA-SOUTH LGA

HONG-KUVU GAYA (HONG L.G) AND CONSTRUCTION OF 3 CELL OF 3 BY 2 METERS BOX CULVERT ALONG MATAKAM-FUTU ROAD (MICHIKA L.G) –  UNDER THE SUPERVISION OF MINISTRY OF RURAL INFRASTRUCTURE AND COMMUNITY DEVELOPMENT IN COLLABORATION WITH RAMP II (ALL COMPLETED).

DSC_8244

Replacement of Transformers

InShot_20231003_114717453

CONSTRUCTION OF 20.8 Km SUPER HIGH WAY FROM WELCOME TO YOLA TO RUMDE

DSC_8733

Reconnected Michika and Madagali to the National after 6 years

DSC_8234

Supervision of installation of transformers

DSC_8731

Provision of electric transformers to 45 local communities in Adamawa under the Ministry of Rural Infrastructure & Community Development

Slide20

Connected Toungo LG to the National Grid for the first time in 25 years

Ongoing Construction of 2.42 Township Roads in Mubi South Local Government

WhatsApp Image 2023-11-08 at 09.31.59_8af6a145

Construction of drainage at the site

WhatsApp Image 2023-11-08 at 09.31.59_056030ba

Dump trucks, pilling dirt around the site and slope the land to meet the needs of the road.

WhatsApp Image 2023-11-08 at 09.31.59_93c8d462

Excavation process to creating a pathway to direct water away from the road surface.

vi boka

Construction of a 7.8-kilometer road at Vi/Bokka Ward in Michika Local Government Passing through Wambilimi, Yamwe to Vi communities.

WhatsApp Image 2023-11-08 at 09.32.00_2a8c38ae

Construction of drainage at the site

New Government House

GOVERNOR AHMADU UMARU FINTIRI IS REMODELLING AND UPGRADING FOUR GOVERNMENT HOUSE LODGES

NG CARES ADAMAWA DLI 2.2 PROJECTS INFRATRUCTURE IMPLEMENTED IN ADAMAWA STATE

1

Road project at Dukdu Toungo LGA

fx

Bode in Shelleng LGA

2

Wuro Kohi Mayo Farang

cccv

Bolki Road in Guyuk LGA

66

Wuro Hawu Gantan in Jada LGA

mlw;

Kumare community in Hong LGA

caSCad

Madzi Bidi Road

gss

Gangoki Market road in Ganye

lmfkrg

Ghumbuli road

vcm

Wuro Kohi Mayo farang in Mayo Belwa LGA

ss

Yaza palala in Mubi-North

dda

Walawa-juda road in Gombi

cccc

Rugange Bajeng road Lamurde LGA

bac

Bachure Community in Yola-North LGA

Mubi Flyover

Ongoing Construction of Mubi Round about Flyover

storm water frainage

Ongoing construction of storm water drainage at Saminaka FGGC Yola

wuro 7

Ongoing road construction linking Wuro Ngayadi Bridge Kirchinga ward Madagali LGA

Housing unit

update on the ongoing  construction of road network at 1000 Housing unit

WhatsApp Image 2024-01-24 at 09.59.27_30f149ba

Update of Work on Mampaya road in Uba

pedestrian fly over

Construction of pedestrian flyovers in Jimeta

IMG-20240207-WA0095

Update on the ongoing construction of Mubi-Roundabout Flyover

stadiummmm

ADAMAWA ULTRA MODERN STADIUM PROJECT UPDATE

mak

Makama B road

baga

Bagale Road in Fufore LGA

Mubi flyover 2

32 millimeter-diameter rods to ensure structural integrity at the ongoing Mubi roundabout flyover

storm water ddrainade

Ongoing construction of storm water drainage at Saminaka FGGC Yola

Wuro 3

Roads construction at Wuro Ngayadi Kirchinga ward Madagali LGA

WhatsApp Image 2024-01-17 at 06.58.45_48602dfc

Ongoing construction of road network at 1000 Housing unit

WhatsApp-Image-2024-01-24-at-09.59.29_37eb3c40

Progress of Work on Mampaya road in Uba

STORM WATER MDG

Construction of Stormwater drainages in Gulak and Shuwa of Madagali

InShot_20240426_092222463

Update on the ongoing construction of Mubi-Round about flyover

governors office

Adamawa State Government constructed the New Governor’s Office in Yola, Adamawa State

don

Dong Gamadiyo ring culvert

maya

Mayel-Salma Wuro Mallum road in Maiha LGA

storm water drainage

Road construction to ease difficulties during rainy season at Saminaka FGGC Yola

wuron Bridge

Ongoing construction of Wurongayandi Bridge in Kirchinga Ward, Madagali

wuro 4

Wuro Ngayadi Bridge Kirchinga ward ongoing Madagali LGA

DCIM100MEDIADJI_0797.JPG

 ONGOING CONSTRUCTION OF 2,000 HOUSING ESTATES FOR CIVIL SERVANTS AT MALKOHI, YOLA.

Housing

UPDATE ON THE ONGOING CONSTRUCTION OF 1,000 HOUSING ESTATES FOR AT MALKOHI, YOLA.

TOWNSHIP ROAD

Construction of Madagali Township Roads

Mubi flyover

STAGE OF CONSTRUCTION WORKS ON THE MUBI ROUNDABOUT FLYOVER